About this reports reported at the enterprise Olnova Recyclingtechnik – Hammel-Ukraine.
"Last week, our Company put into operation another OLNOVA MSL-1 sorting line for solid waste in Transcarpathia. Productivity up to 15 tons of solid waste per hour. 2 fractions (0-50 mm) and black metal are mechanically selected," the report says.
The sorting cabin, designed for the simultaneous selection of 16 fractions of recycled material, is equipped with lighting, ventilation, and antibacterial protection.
Each workplace is equipped with an emergency stop button. The time of production and installation of such a line takes up to 6 months, including construction works.
See also:
A waste processing plant is planned to be built in Kremenchuk
In Zhytomyr, the first private waste processing plant in Ukraine became operational